Volume 21 (2023)
Volume 20 (2022-2023)
Volume 19 (2021-2022)
Volume 18 (2020-2021)
Volume 17 (2019-2020)
Volume 16 (2018-2019)
Volume 15 (2017-2018)
Volume 14 (2016-2017)
Volume 13 (2015-2016)
Volume 12 (2014-2015)
Volume 11 (2013-2014)
Volume 10 (2012-2013)
Volume 9 (2011-2012)
Volume 8 (2010-2011)
Volume 7 (2009-2010)
Volume 6 (2008-2009)
Volume 5 (2007-2008)
Volume 4 (2006-2007)
Volume 3 (2005-2006)
Volume 2 (2004-2005)
Volume 1 (2003-2004)
Environmental impact assessment of cathode copper factory establishment using flash furnace method in Sungun copper complex

Maryam Hatami; Abdorreza Vaezihir; Mohammad Hasanpour Sedghi

Volume 17, Issue 2 , July 2019, , Pages 125-138

https://doi.org/10.29252/envs.17.2.125

Abstract
  Introduction: In order to reduce environmental hazards, Environmental Impact Assessment (EIA) is a legal requirement for the construction of metal processing and production factories. The purpose of this study was to assess the environmental impacts of the establishment of Sungun cathode copper factory ...  Read More